Ferrari

 Case     |      2021-06-18 01:01:09

法拉利.png

Italy-Ferrari Maranello factory installed four ER 16 SE series industrial gas burners, each with an output of 16 MW, installed on four OMP Panini hot water boilers, equipped with fully automatic air/gas ratio control and electronic ratio Tune. The combustion state is adjusted through flue gas analysis, and the fan adjustment is controlled by a variable expansion line. 


The main operating parameter control and factory alarm status are realized by special software. The team of engineers at the group headquarters has successfully completed this project.